Star Group delivered the electrical and communications services for the West Camden Water Treatment Plant Upgrade, supporting critical infrastructure improvements that will accommodate population growth across Sydney's south-west and improve effluent quality into the future.

Engaged by Downer/BMD JV, Star Group's scope included the delivery of electrical, instrumentation, control and SCADA systems across the Membrane Bioreactor (MBR), Inlet Works and Chemical Dosing facilities, together with site-wide distribution, lighting and power systems, equipment integration, testing and commissioning. The works were completed within a live operational treatment facility and included upgrades to support the plant's long-term capacity, reliability and operational performance.

Client  Downer / BMD JV
Contract Value  $8 Million
Services  Construct Only
Branch NSW
Electrical Installation
High Voltage
Communications & Data
Controlled Automation
Project Management

Star Group's scope of works included, but was not limited to:

  • Membrane Bioreactor (MBR) System
  • Inlet Works
  • Chemical Dosing Systems
  • SCADA Systems
  • PLC and Remote I/O Panels
  • Site-Wide Instrumentation
  • Distribution Boards
  • Tanker Unloading Panels
  • Variable Speed Drives (VSDs)
  • Active Harmonic Filters
  • UPS and Battery Chargers
  • Generator Connection Boxes
  • LV Remote Switching Panel
  • HV Remote Switching Panel
  • Cable Containment, Lighting and Power
  • Earthing and Lightning Protection Systems
  • Weather Station Relocation
  • Testing and Commissioning
  • Decommissioning of Redundant Equipment