The Wellington Rapid Build Development project involved the design and construction of a new 400 bed regional correctional centre for the Department of Justice NSW. The centre provides inmate accommodation of maximum security classification.

Client  Hansen Yuncken
Contract Value  $15 Million
Services  Design & Construct
Branch Sydney Region
Electrical Installation
High Voltage
Communications & Data
Controlled Automation
Project Management

STAR Group provided electrical services on the project, this involved services to 14 separate buildings which includes 4 accommodation buildings with dormitory pods, areas for inmate education, employment and recreation, a gatehouse, administration areas, staff and visitors facilities, kitchen and stores building, laundry, clinic, transport response unit and inmate reception.

Star Group’s services provided on the project included:

  • Power supply, services and control
  • Power factor correction
  • Electricity metering
  • Earthing systems
  • Emergency power supplies
  • UPS and control systems
  • Distribution boards
  • External lighting
  • Route markers and plates
  • Drainage from bottom of in-ground propriety cables pits
  • Lockable pits
  • Cabling, cable trays and support systems
  • Passive Telecom cabling infrastructure
  • Public Address cabling infrastructure
  • MATV system
  • Final sub-circuit wiring
  • Outlets, permanent connections accessories, switches and controls
  • Luminaires and control systems
  • Lighting and computer monitoring
  • Surge protection and Filtration
  • Power to Hydraulic and Mechanical Systems
  • Draw wires
  • IP- Water proof rating boards
  • Communication systems
  • Diesel generator; and
  • Small Penetrations, Fire Stopping and resealing.