The Train Working Order is a project which advances rail safety through the replacement of current electric train staff and ordinary staff safe working system with Phoenix Train Order Working for a variety of rail sections.

Furthermore, the installation, testing and commissioning of verified signalling equipment was required to ensure the safe movement and coordination of rail activity throughout the region.The project also included the installation, testing and commissioning works as required by the supplied verified signalling design of the train. Order working signalling equipment for the below sections:

  1. Goobang junction (448.500 km) to Narromine (497.500 km)
  2. Narromine (497.500 km) to Dubbo (462.000 km)
  3. Dubbo (462.000 km) to Merrygoen (417.785 km)
  4. Merrygoen (417.785 km) to Gulgong (459.500 km)


 

Client Australian Rail Track Corporation Ltd
Contract Value $1.3 Million
Services Rail Signalling & Engineering
Branch Rail, Engineering & Infrastructure